Wednesday, March 9, 2011

Two in one

Work is moving so fast on the house, I can't keep up with my posts. So here is two in one. First, the second floor joists and subfloor were completed last week.

This one shows the main floor looking towards the living room. You can see how tall the ceilings are.


This is looking into the master bedroom on the top floor - 15' ceilings up here!


The next few are from several days later - the start of framing! The interior walls (the long one shared with the house next door) will have exposed brick but we have to insulate all of the exterior walls.

Here is the main floor looking into the back corner of the kitchen. There will be cabinets in this corner so we need drywall here.

These are the kitchen windows. All of the old, rotting wooden window frames have been pulled out. There will be an amazing amount of light in our kitchen.


A new window frame, looking out onto 8th Street from the main floor.



No comments:

Post a Comment